{"id":1861,"date":"2026-06-15T01:02:59","date_gmt":"2026-06-15T01:02:59","guid":{"rendered":"https:\/\/apexecobuilt.com\/90-day-modular-project-timeline-inquiry-to-site-delivery\/"},"modified":"2026-06-15T01:02:59","modified_gmt":"2026-06-15T01:02:59","slug":"90-day-modular-project-timeline-inquiry-to-site-delivery","status":"publish","type":"post","link":"https:\/\/apexecobuilt.com\/es\/90-day-modular-project-timeline-inquiry-to-site-delivery\/","title":{"rendered":"From Inquiry to Site Delivery: What a Realistic 90-Day Modular Project Timeline Looks Like"},"content":{"rendered":"<\/p>\n<p>A realistic 90-day modular project timeline breaks down into roughly 25 days of engineering and procurement, 35 days of factory production, and 30 days of logistics plus on-site installation \u2014 with phases deliberately overlapping. Hit 90 days from inquiry to handover is absolutely doable for projects under 2,000 m\u00b2, but only if the first two weeks are spent finalizing specs instead of revising them. The schedule fails not at the factory, but at the email back-and-forth that nobody tracks.<\/p>\n<p>Below is a week-by-week breakdown of what a well-run 90-day project actually looks like \u2014 including the buffer days experienced buyers insist on, and the four points where most timelines slip.<\/p>\n<h2>Days 1\u201310: The Inquiry Phase Decides Whether You Hit 90 Days at All<\/h2>\n<p>Most missed deadlines are baked in during the first ten days. If your spec sheet is vague \u2014 \u201cwe need around 24 modules, 30 m\u00b2 each, maybe with steel frame\u201d \u2014 every downstream phase inherits that ambiguity.<\/p>\n<h3>What needs to happen in week 1<\/h3>\n<ul>\n<li>Kick-off call with the manufacturer&#8217;s technical team (not just sales)<\/li>\n<li>Site survey data shared: coordinates, soil report, access road width, crane availability<\/li>\n<li>Climate and code requirements documented: wind load, snow load, seismic zone, fire rating<\/li>\n<li>Function brief: how many beds, bathrooms, MEP load per module<\/li>\n<\/ul>\n<h3>Week 2: lock the spec<\/h3>\n<p>By day 10 you need a signed quotation tied to a frozen specification sheet. For instance, a contractor in Saudi Arabia building a 40-room worker camp shaved 12 days off their schedule simply by sending the geotechnical report on day 2 instead of day 18. Without it, the foundation design \u2014 and therefore the module floor structure \u2014 sits idle.<\/p>\n<p>If you&#8217;re still comparing suppliers at day 10, your 90-day clock hasn&#8217;t started yet. Pick one. Our <a href=\"\/manufacturing-capabilities\/\">manufacturing capabilities<\/a> page outlines what data you&#8217;ll need ready before that first call.<\/p>\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/apexecobuilt.com\/wp-content\/uploads\/2026\/06\/90-day-modular-project-timeline-inquiry-to-site-delivery-inline-1.png\" alt=\"Engineering desk with technical drawings and laptop showing 3D modular building model\"><figcaption class=\"wp-element-caption\">Engineering desk with technical drawings and laptop showing 3D modular building model<\/figcaption><\/figure>\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/apexecobuilt.com\/wp-content\/uploads\/2026\/06\/90-day-modular-project-timeline-inquiry-to-site-delivery-inline-2.png\" alt=\"Close-up of detailed architectural shop drawings on a drafting table\"><figcaption class=\"wp-element-caption\">Close-up of detailed architectural shop drawings on a drafting table<\/figcaption><\/figure>\n<h2>Days 11\u201325: Engineering and Shop Drawings \u2014 The Hidden Critical Path<\/h2>\n<p>Here&#8217;s the part most buyers underestimate. Engineering takes 15 working days for a typical 1,500\u20132,500 m\u00b2 modular project, and it&#8217;s the single most common source of slippage. Why? Because every revision round costs 3\u20135 days, and the average project has three.<\/p>\n<h3>What&#8217;s being produced<\/h3>\n<ul>\n<li>Structural calculations stamped by a licensed engineer<\/li>\n<li>Architectural shop drawings (module-level and assembly-level)<\/li>\n<li>MEP routing \u2014 plumbing, electrical, HVAC per module<\/li>\n<li>Connection details between modules and to the foundation<\/li>\n<li>Curtain wall or facade integration drawings if applicable<\/li>\n<\/ul>\n<h3>The revision trap<\/h3>\n<p>One revision is normal. Two means the brief was incomplete. Three or more means you&#8217;re rebuilding the design mid-flight. The fix: insist on a 48-hour client-side approval SLA in your contract. If your team can&#8217;t approve drawings in two business days, the manufacturer can&#8217;t hold the slot.<\/p>\n<p>For complex facades, our breakdown on <a href=\"\/blog\/unitized-vs-stick-built-curtain-walls-comparison\/\">unitized vs. stick-built curtain walls<\/a> explains why the engineering window doubles when you switch systems mid-project.<\/p>\n<h2>Days 20\u201340: Material Procurement Runs in Parallel \u2014 Or You Lose Two Weeks<\/h2>\n<p>Smart manufacturers start procurement on day 20, not day 26. Long-lead items \u2014 specialty glass, custom aluminum extrusions, branded HVAC units \u2014 need to land on the factory floor by day 35 at the latest, because production can&#8217;t start without them.<\/p>\n<h3>Typical lead times that quietly kill schedules<\/h3>\n<ul>\n<li>Low-E insulated glass units: 18\u201325 days<\/li>\n<li>Custom-anodized aluminum profiles: 15\u201320 days<\/li>\n<li>European or Japanese HVAC units: 30\u201345 days (this is the killer)<\/li>\n<li>Fire-rated doors with specific certifications: 20\u201330 days<\/li>\n<\/ul>\n<p>If a buyer specifies a Daikin VRF system at day 5, they&#8217;re locked into that 45-day clock. A smart manufacturer will flag this and propose a regionally available equivalent \u2014 saving two weeks without compromising performance.<\/p>\n<h3>Why factory scale matters here<\/h3>\n<p>A 150,000 m\u00b2 production base buys raw aluminum in continuous coil tonnage, not project-by-project. That means alloy 6063 profiles for your modules are usually in stock or weeks ahead in the extrusion queue. Smaller fabricators wait in line at someone else&#8217;s mill. That difference alone can mean a 10-day swing in your schedule.<\/p>\n<h2>Days 30\u201365: Factory Production \u2014 Where the 90-Day Schedule Is Won<\/h2>\n<p>Factory production is 35 days for a mid-sized modular project, and it&#8217;s the most predictable phase \u2014 if procurement landed on time. Modules are built in parallel batches of 4\u20138, not sequentially.<\/p>\n<h3>The production sequence inside a module<\/h3>\n<ol>\n<li>Days 30\u201338: Steel or aluminum frame welding and inspection<\/li>\n<li>Days 36\u201345: Floor, wall, and ceiling panel installation<\/li>\n<li>Days 42\u201352: MEP rough-in and pressure testing<\/li>\n<li>Days 48\u201358: Interior finishes, fixtures, sanitary ware<\/li>\n<li>Days 55\u201363: Facade integration, glazing, weather sealing<\/li>\n<li>Days 60\u201365: Quality inspection, water test, packing<\/li>\n<\/ol>\n<h3>The water test is non-negotiable<\/h3>\n<p>Every finished module should be sprayed with a calibrated water rig before it leaves the factory. We&#8217;ve seen projects skip this to save two days, then lose three weeks on-site chasing leaks. A pre-shipment water test is the single highest-ROI quality gate in modular construction. Related reading: <a href=\"\/blog\/curtain-wall-water-leakage-design-flaws-prevention\/\">why curtain wall water leakage happens<\/a>.<\/p>\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/apexecobuilt.com\/wp-content\/uploads\/2026\/06\/90-day-modular-project-timeline-inquiry-to-site-delivery-inline-3.png\" alt=\"Modular building modules in parallel production stages inside an aluminum manufacturing factory\"><figcaption class=\"wp-element-caption\">Modular building modules in parallel production stages inside an aluminum manufacturing factory<\/figcaption><\/figure>\n<h2>Days 60\u201380: Logistics \u2014 The Phase Nobody Plans Enough Buffer For<\/h2>\n<p>Shipping is where optimistic timelines die. Ocean freight from China to the Middle East is 18\u201325 days port-to-port. To Europe, 28\u201335 days. And that&#8217;s before customs.<\/p>\n<h3>What needs to happen in parallel<\/h3>\n<ul>\n<li>Day 55: Export documentation prepared (commercial invoice, packing list, CO, fumigation cert)<\/li>\n<li>Day 62: Container booking confirmed \u2014 book 3 weeks ahead during peak season<\/li>\n<li>Day 65: First modules loaded; high-cube 40\u2032 containers for standard 3m-wide modules, flat-racks for oversized<\/li>\n<li>Day 70\u201378: Sea transit<\/li>\n<li>Day 78\u201382: Destination customs clearance<\/li>\n<\/ul>\n<h3>The site access reality check<\/h3>\n<p>A 12m module on a flat-rack needs a road wide enough, low-clearance bridges checked, and a crane with the right reach. One resort developer in Oman discovered on delivery day that the last 2 km of access road had a 3.5m bridge clearance \u2014 their modules were 3.8m tall. Three weeks lost. Our guide on <a href=\"\/blog\/shipping-modular-buildings-across-borders-container-customs-site-access\/\">shipping modular buildings across borders<\/a> covers this in detail.<\/p>\n<p>Build a 5-day logistics buffer into any 90-day plan. If you don&#8217;t need it, great. If you do, you didn&#8217;t slip the deadline.<\/p>\n<h2>Days 75\u201390: Site Installation and Commissioning<\/h2>\n<p>On-site work for a 40-module project takes 10\u201315 days if the foundation is ready and the crane is booked. The sequence is brutal in its simplicity: lift, set, connect, seal, test.<\/p>\n<h3>Daily output you should expect<\/h3>\n<ul>\n<li>Crane setting: 6\u201310 modules per day with a 50-ton mobile crane<\/li>\n<li>Inter-module connections (structural + MEP): 4\u20136 modules per day per crew<\/li>\n<li>Weatherproofing and external sealing: 2 days for a 30-module footprint<\/li>\n<li>Commissioning and snagging: 3\u20135 days<\/li>\n<\/ul>\n<h3>The foundation has to be ready by day 70<\/h3>\n<p>This is the most common 90-day failure: modules arriving at day 80 to a half-built foundation. Foundation work should start no later than day 45 \u2014 running parallel to factory production. Screw piles can be installed in 3\u20135 days for a small camp; concrete strip foundations need 14\u201321 days plus cure time.<\/p>\n<p>For a mining client deploying a 60-bed camp in northern Kazakhstan, screw piles let the site team start foundations on day 55 and finish by day 68, perfectly synced with module arrival. See our piece on <a href=\"\/blog\/fast-deployable-worker-camps-mining-oil-gas-modular-supplier\/\">fast-deployable worker camps<\/a> for more on this pattern.<\/p>\n<h2>The Four Points Where 90-Day Projects Actually Slip<\/h2>\n<p>After tracking dozens of projects, the same four bottlenecks appear:<\/p>\n<h3>1. Client-side approval delays (median: 8 days lost)<\/h3>\n<p>Drawings sit in someone&#8217;s inbox. Solution: name a single signing authority in the contract.<\/p>\n<h3>2. Spec changes after day 25 (median: 12 days lost)<\/h3>\n<p>Once engineering is locked, every change cascades. If the change is unavoidable, freeze unrelated work to contain the damage.<\/p>\n<h3>3. Customs and documentation errors (median: 5 days lost)<\/h3>\n<p>Wrong HS code, missing certificate of origin, mismatched packing list. Use a freight forwarder who&#8217;s shipped modular before, not just general cargo.<\/p>\n<h3>4. Foundation not ready (median: 7 days lost)<\/h3>\n<p>The site team underestimates curing time or weather delays. Always run foundation work parallel to production, never sequentially.<\/p>\n<p>Add these up and you see why 90-day projects that don&#8217;t plan buffers routinely become 120-day projects. The fix isn&#8217;t rushing \u2014 it&#8217;s overlapping phases and naming accountable owners.<\/p>\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/apexecobuilt.com\/wp-content\/uploads\/2026\/06\/90-day-modular-project-timeline-inquiry-to-site-delivery-inline-4.png\" alt=\"Prefabricated modules being loaded onto shipping containers at a port for international delivery\"><figcaption class=\"wp-element-caption\">Prefabricated modules being loaded onto shipping containers at a port for international delivery<\/figcaption><\/figure>\n<h2>A Realistic 90-Day Gantt at a Glance<\/h2>\n<p>Here&#8217;s how the phases overlap when the project is run well:<\/p>\n<ul>\n<li><strong>Week 1\u20132:<\/strong> Inquiry, spec lock, contract<\/li>\n<li><strong>Week 2\u20134:<\/strong> Engineering and shop drawings<\/li>\n<li><strong>Week 3\u20136:<\/strong> Procurement (overlapping engineering tail end)<\/li>\n<li><strong>Week 5\u20139:<\/strong> Factory production<\/li>\n<li><strong>Week 7\u201310:<\/strong> Foundation work on site (parallel)<\/li>\n<li><strong>Week 9\u201312:<\/strong> Shipping and customs<\/li>\n<li><strong>Week 11\u201313:<\/strong> Installation and commissioning<\/li>\n<\/ul>\n<p>Notice the overlaps. Sequential thinking \u2014 finish one phase, start the next \u2014 gives you a 140-day project. Overlapping thinking gives you 90.<\/p>\n<h2>Planning Your Own 90-Day Build<\/h2>\n<p>If you take one thing from this: the 90-day timeline isn&#8217;t a manufacturing problem, it&#8217;s a coordination problem. The factory floor is the most predictable part. The variability lives in how fast your team approves drawings, how complete your site survey is, and whether your foundation contractor starts on day 45 or day 75.<\/p>\n<p>Before sending your next RFQ, prepare: a site survey with coordinates and access dimensions, a soil report, your climate and code requirements, a clear function brief, and a named decision-maker for sign-offs. That single hour of prep can save you three weeks downstream.<\/p>\n<p>If you&#8217;re scoping a modular project and want a realistic timeline mapped against your specific site, brief, and shipping route, the team at apexecobuilt can walk through it with you. Start with our <a href=\"\/solutions\/\">modular solutions overview<\/a>, browse delivered <a href=\"\/projects\/\">projects<\/a> for benchmarks, or <a href=\"\/contact-us\/\">get in touch<\/a> with your draft spec \u2014 we&#8217;ll mark up the critical-path risks before you commit.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A realistic week-by-week 90-day modular project timeline from inquiry to site delivery \u2014 milestones, bottlenecks, and buffer time. Plan smarter today.<\/p>\n","protected":false},"author":1,"featured_media":1856,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[154],"tags":[155,156,157],"class_list":["post-1861","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-company","tag-modular-building-delivery-schedule","tag-prefab-construction-timeline","tag-modular-project-milestones"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>90-Day Modular Project Timeline Guide | apexecobuilt<\/title>\n<meta name=\"description\" content=\"A realistic week-by-week 90-day modular project timeline from inquiry to site delivery \u2014 milestones, bottlenecks, and buffer time. Plan smarter today.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/apexecobuilt.com\/es\/90-day-modular-project-timeline-inquiry-to-site-delivery\/\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"90-Day Modular Project Timeline Guide | apexecobuilt\" \/>\n<meta property=\"og:description\" content=\"A realistic week-by-week 90-day modular project timeline from inquiry to site delivery \u2014 milestones, bottlenecks, and buffer time. Plan smarter today.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/apexecobuilt.com\/es\/90-day-modular-project-timeline-inquiry-to-site-delivery\/\" \/>\n<meta property=\"og:site_name\" content=\"APEX Ecobuilt\" \/>\n<meta property=\"article:published_time\" content=\"2026-06-15T01:02:59+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/apexecobuilt.com\/wp-content\/uploads\/2026\/06\/90-day-modular-project-timeline-inquiry-to-site-delivery-featured.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1408\" \/>\n\t<meta property=\"og:image:height\" content=\"768\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Julie Chan\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Julie Chan\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"7 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/apexecobuilt.com\\\/es\\\/90-day-modular-project-timeline-inquiry-to-site-delivery\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/apexecobuilt.com\\\/es\\\/90-day-modular-project-timeline-inquiry-to-site-delivery\\\/\"},\"author\":{\"name\":\"Julie Chan\",\"@id\":\"https:\\\/\\\/apexecobuilt.com\\\/es\\\/#\\\/schema\\\/person\\\/12297cefffd1111bc8e967428633dba5\"},\"headline\":\"From Inquiry to Site Delivery: What a Realistic 90-Day Modular Project Timeline Looks Like\",\"datePublished\":\"2026-06-15T01:02:59+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/apexecobuilt.com\\\/es\\\/90-day-modular-project-timeline-inquiry-to-site-delivery\\\/\"},\"wordCount\":1555,\"image\":{\"@id\":\"https:\\\/\\\/apexecobuilt.com\\\/es\\\/90-day-modular-project-timeline-inquiry-to-site-delivery\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/apexecobuilt.com\\\/es\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/90-day-modular-project-timeline-inquiry-to-site-delivery-featured.png\",\"keywords\":[\"modular building delivery schedule\",\"prefab construction timeline\",\"modular project milestones\"],\"articleSection\":[\"Company\"],\"inLanguage\":\"es_ES\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/apexecobuilt.com\\\/es\\\/90-day-modular-project-timeline-inquiry-to-site-delivery\\\/\",\"url\":\"https:\\\/\\\/apexecobuilt.com\\\/es\\\/90-day-modular-project-timeline-inquiry-to-site-delivery\\\/\",\"name\":\"90-Day Modular Project Timeline Guide | apexecobuilt\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/apexecobuilt.com\\\/es\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/apexecobuilt.com\\\/es\\\/90-day-modular-project-timeline-inquiry-to-site-delivery\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/apexecobuilt.com\\\/es\\\/90-day-modular-project-timeline-inquiry-to-site-delivery\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/apexecobuilt.com\\\/es\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/90-day-modular-project-timeline-inquiry-to-site-delivery-featured.png\",\"datePublished\":\"2026-06-15T01:02:59+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/apexecobuilt.com\\\/es\\\/#\\\/schema\\\/person\\\/12297cefffd1111bc8e967428633dba5\"},\"description\":\"A realistic week-by-week 90-day modular project timeline from inquiry to site delivery \u2014 milestones, bottlenecks, and buffer time. Plan smarter today.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/apexecobuilt.com\\\/es\\\/90-day-modular-project-timeline-inquiry-to-site-delivery\\\/#breadcrumb\"},\"inLanguage\":\"es_ES\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/apexecobuilt.com\\\/es\\\/90-day-modular-project-timeline-inquiry-to-site-delivery\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"es_ES\",\"@id\":\"https:\\\/\\\/apexecobuilt.com\\\/es\\\/90-day-modular-project-timeline-inquiry-to-site-delivery\\\/#primaryimage\",\"url\":\"https:\\\/\\\/apexecobuilt.com\\\/es\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/90-day-modular-project-timeline-inquiry-to-site-delivery-featured.png\",\"contentUrl\":\"https:\\\/\\\/apexecobuilt.com\\\/es\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/90-day-modular-project-timeline-inquiry-to-site-delivery-featured.png\",\"width\":1408,\"height\":768,\"caption\":\"From Inquiry to Site Delivery: What a Realistic 90-Day Modular Project Timeline Looks Like\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/apexecobuilt.com\\\/es\\\/90-day-modular-project-timeline-inquiry-to-site-delivery\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/apexecobuilt.com\\\/es\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Company\",\"item\":\"https:\\\/\\\/apexecobuilt.com\\\/es\\\/category\\\/company\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"From Inquiry to Site Delivery: What a Realistic 90-Day Modular Project Timeline Looks Like\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/apexecobuilt.com\\\/es\\\/#website\",\"url\":\"https:\\\/\\\/apexecobuilt.com\\\/es\\\/\",\"name\":\"APEX Ecobuilt\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/apexecobuilt.com\\\/es\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"es_ES\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/apexecobuilt.com\\\/es\\\/#\\\/schema\\\/person\\\/12297cefffd1111bc8e967428633dba5\",\"name\":\"Julie Chan\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es_ES\",\"@id\":\"https:\\\/\\\/apexecobuilt.com\\\/es\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/cropped-avatar-96x96.jpg\",\"url\":\"https:\\\/\\\/apexecobuilt.com\\\/es\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/cropped-avatar-96x96.jpg\",\"contentUrl\":\"https:\\\/\\\/apexecobuilt.com\\\/es\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/cropped-avatar-96x96.jpg\",\"caption\":\"Julie Chan\"},\"description\":\"Product managerSenior Product Manager specializing in facade systems and curtain wall solutions, with experience in commercial and residential projects.\",\"sameAs\":[\"https:\\\/\\\/apexecobuilt.com\\\/es\\\/\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"90-Day Modular Project Timeline Guide | apexecobuilt","description":"A realistic week-by-week 90-day modular project timeline from inquiry to site delivery \u2014 milestones, bottlenecks, and buffer time. Plan smarter today.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/apexecobuilt.com\/es\/90-day-modular-project-timeline-inquiry-to-site-delivery\/","og_locale":"es_ES","og_type":"article","og_title":"90-Day Modular Project Timeline Guide | apexecobuilt","og_description":"A realistic week-by-week 90-day modular project timeline from inquiry to site delivery \u2014 milestones, bottlenecks, and buffer time. Plan smarter today.","og_url":"https:\/\/apexecobuilt.com\/es\/90-day-modular-project-timeline-inquiry-to-site-delivery\/","og_site_name":"APEX Ecobuilt","article_published_time":"2026-06-15T01:02:59+00:00","og_image":[{"width":1408,"height":768,"url":"https:\/\/apexecobuilt.com\/wp-content\/uploads\/2026\/06\/90-day-modular-project-timeline-inquiry-to-site-delivery-featured.png","type":"image\/png"}],"author":"Julie Chan","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Julie Chan","Est. reading time":"7 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/apexecobuilt.com\/es\/90-day-modular-project-timeline-inquiry-to-site-delivery\/#article","isPartOf":{"@id":"https:\/\/apexecobuilt.com\/es\/90-day-modular-project-timeline-inquiry-to-site-delivery\/"},"author":{"name":"Julie Chan","@id":"https:\/\/apexecobuilt.com\/es\/#\/schema\/person\/12297cefffd1111bc8e967428633dba5"},"headline":"From Inquiry to Site Delivery: What a Realistic 90-Day Modular Project Timeline Looks Like","datePublished":"2026-06-15T01:02:59+00:00","mainEntityOfPage":{"@id":"https:\/\/apexecobuilt.com\/es\/90-day-modular-project-timeline-inquiry-to-site-delivery\/"},"wordCount":1555,"image":{"@id":"https:\/\/apexecobuilt.com\/es\/90-day-modular-project-timeline-inquiry-to-site-delivery\/#primaryimage"},"thumbnailUrl":"https:\/\/apexecobuilt.com\/es\/wp-content\/uploads\/2026\/06\/90-day-modular-project-timeline-inquiry-to-site-delivery-featured.png","keywords":["modular building delivery schedule","prefab construction timeline","modular project milestones"],"articleSection":["Company"],"inLanguage":"es_ES"},{"@type":"WebPage","@id":"https:\/\/apexecobuilt.com\/es\/90-day-modular-project-timeline-inquiry-to-site-delivery\/","url":"https:\/\/apexecobuilt.com\/es\/90-day-modular-project-timeline-inquiry-to-site-delivery\/","name":"90-Day Modular Project Timeline Guide | apexecobuilt","isPartOf":{"@id":"https:\/\/apexecobuilt.com\/es\/#website"},"primaryImageOfPage":{"@id":"https:\/\/apexecobuilt.com\/es\/90-day-modular-project-timeline-inquiry-to-site-delivery\/#primaryimage"},"image":{"@id":"https:\/\/apexecobuilt.com\/es\/90-day-modular-project-timeline-inquiry-to-site-delivery\/#primaryimage"},"thumbnailUrl":"https:\/\/apexecobuilt.com\/es\/wp-content\/uploads\/2026\/06\/90-day-modular-project-timeline-inquiry-to-site-delivery-featured.png","datePublished":"2026-06-15T01:02:59+00:00","author":{"@id":"https:\/\/apexecobuilt.com\/es\/#\/schema\/person\/12297cefffd1111bc8e967428633dba5"},"description":"A realistic week-by-week 90-day modular project timeline from inquiry to site delivery \u2014 milestones, bottlenecks, and buffer time. Plan smarter today.","breadcrumb":{"@id":"https:\/\/apexecobuilt.com\/es\/90-day-modular-project-timeline-inquiry-to-site-delivery\/#breadcrumb"},"inLanguage":"es_ES","potentialAction":[{"@type":"ReadAction","target":["https:\/\/apexecobuilt.com\/es\/90-day-modular-project-timeline-inquiry-to-site-delivery\/"]}]},{"@type":"ImageObject","inLanguage":"es_ES","@id":"https:\/\/apexecobuilt.com\/es\/90-day-modular-project-timeline-inquiry-to-site-delivery\/#primaryimage","url":"https:\/\/apexecobuilt.com\/es\/wp-content\/uploads\/2026\/06\/90-day-modular-project-timeline-inquiry-to-site-delivery-featured.png","contentUrl":"https:\/\/apexecobuilt.com\/es\/wp-content\/uploads\/2026\/06\/90-day-modular-project-timeline-inquiry-to-site-delivery-featured.png","width":1408,"height":768,"caption":"From Inquiry to Site Delivery: What a Realistic 90-Day Modular Project Timeline Looks Like"},{"@type":"BreadcrumbList","@id":"https:\/\/apexecobuilt.com\/es\/90-day-modular-project-timeline-inquiry-to-site-delivery\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/apexecobuilt.com\/es\/"},{"@type":"ListItem","position":2,"name":"Company","item":"https:\/\/apexecobuilt.com\/es\/category\/company\/"},{"@type":"ListItem","position":3,"name":"From Inquiry to Site Delivery: What a Realistic 90-Day Modular Project Timeline Looks Like"}]},{"@type":"WebSite","@id":"https:\/\/apexecobuilt.com\/es\/#website","url":"https:\/\/apexecobuilt.com\/es\/","name":"APEX Ecobuilt","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/apexecobuilt.com\/es\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es_ES"},{"@type":"Person","@id":"https:\/\/apexecobuilt.com\/es\/#\/schema\/person\/12297cefffd1111bc8e967428633dba5","name":"Julie Chan","image":{"@type":"ImageObject","inLanguage":"es_ES","@id":"https:\/\/apexecobuilt.com\/es\/wp-content\/uploads\/2026\/03\/cropped-avatar-96x96.jpg","url":"https:\/\/apexecobuilt.com\/es\/wp-content\/uploads\/2026\/03\/cropped-avatar-96x96.jpg","contentUrl":"https:\/\/apexecobuilt.com\/es\/wp-content\/uploads\/2026\/03\/cropped-avatar-96x96.jpg","caption":"Julie Chan"},"description":"Product managerSenior Product Manager specializing in facade systems and curtain wall solutions, with experience in commercial and residential projects.","sameAs":["https:\/\/apexecobuilt.com\/es\/"]}]}},"_links":{"self":[{"href":"https:\/\/apexecobuilt.com\/es\/wp-json\/wp\/v2\/posts\/1861","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/apexecobuilt.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/apexecobuilt.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/apexecobuilt.com\/es\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/apexecobuilt.com\/es\/wp-json\/wp\/v2\/comments?post=1861"}],"version-history":[{"count":0,"href":"https:\/\/apexecobuilt.com\/es\/wp-json\/wp\/v2\/posts\/1861\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/apexecobuilt.com\/es\/wp-json\/wp\/v2\/media\/1856"}],"wp:attachment":[{"href":"https:\/\/apexecobuilt.com\/es\/wp-json\/wp\/v2\/media?parent=1861"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/apexecobuilt.com\/es\/wp-json\/wp\/v2\/categories?post=1861"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/apexecobuilt.com\/es\/wp-json\/wp\/v2\/tags?post=1861"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}